Lots of stuff “coming along” on the Mahdee. Chink, chink, chink is still ongoing. We’re over the “hump” with 1600 linear feet done and about 1000 feet to go. As David says, another 5th of a mile (5 city blocks) with a 2 inch wide caulking iron tapped by a mallet…lengthy process.
John has moved from the covering boards to the cockpit furniture. Today, looking at the lovely mahogany framing of the seating, I must admit it seems a shame to paint it. Argh, I can just see it now–more bright work to keep varnished…
I just saw a great BMW Z-series convertible with “my” color scheme for Mahdee. Tomorrow I need to remember to wear something that is NOT paint spattered so I can drop into the BMW dealership and pick up a brochure with the color schemes…we’re coming down to the wire on selecting that paint color! I need to have something besides the white primer picked out in the next couple of days.
Always something 🙂